|
3 Metre
 |
6 Metre
|
6 Metre
 |
9 Metre
|
12 Metre
 |
|
Eave Height |
2.3m |
2m |
2.3m |
2.3m |
2.3m |
|
Ridge Height |
2.85m |
3.100m |
3.392m |
3.938m |
4.484m |
|
Bay Length |
3m |
2m |
3m |
3m |
3.03m |
|
Roof Pitch |
20º |
20º |
20º |
20º |
20º |
|
Longest Component |
3m |
3.200m |
3.392m |
4.789m |
6.385m |
|
Bracing (Roof) |
N/A |
Plastic Coated Wires |
Plastic Coated Wires |
Plastic Coated Wires |
Plastic Coated Wires |
|
Bracing (Walls) |
Aluminium Cross Bracing or Portal Beam or wires |
Aluminium Cross Bracing or Portal Beam or wires |
Aluminium Cross Bracing or Portal Beam or wires |
Aluminium Cross Bracing or Portal Beam or wires |
Aluminium Cross Bracing or Portal Beam or wires |
|
Max Suspended Load at Centreline (No Snow) |
100kg |
100kg |
100kg |
100kg |
100kg |
|
Design Snow Load using Snow Ties |
100kg/M2 |
100kg/M2 |
100kg/M2 |
- |
- |
|
Wind Loading to BS EN 13782 (2005) |
28m/s 63mph 101kmph |
28m/s 63mph 101kmph |
28m/s 63mph 101kmph |
36m/s 81mph 130kmph |
28m/s 63mph 101kmph |
|
PVC |
Flame retardant to BS7837 Tested to BS5438 UV Resistant |
Flame retardant to BS7837 Tested to BS5438 UV Resistant |
Flame retardant to BS7837 Tested to BS5438 UV Resistant |
Flame retardant to BS7837 Tested to BS5438 UV Resistant |
Flame retardant to BS7837 Tested to BS5438 UV Resistant |
|
People to Pitch |
2 |
2 |
2 |
2 |
4 |
|
Time Required to Erect 2 Bays inc. PVC covers |
1.5hrs |
2hrs |
2.5hrs |
3hrs |
4.5hrs |
|
1st Bay Weight (KG) inc. PVC covers |
180 |
200 |
270 |
370 |
670 |
|
Extension Bay Weight (KG) inc. PVC covers |
90 |
100 |
110 |
140 |
240 |
|
Profile |
94 x 48
 |
94 x 48
 |
94 x 48
 |
94 x 48
 |
114 x 80
 |